When you decide to build a house, a warehouse or a garden wall, one of the first questions is, "How many bricks or aerated concrete blocks do I need to buy?" Getting this number wrong gets expensive in two ways: ordering too few stops the work and incurs a second delivery fee, while ordering too many ties up your money in material sitting in storage. Fortunately, the calculation is simple. In this guide you will find, step by step with numerical examples, the logic used by the Brick and Aerated Concrete Block Quantity Calculator, the unit dimensions, the waste allowance, and the mortar or adhesive estimate.
The basic logic of the calculation
The quantity of wall material is found in four steps:
- Multiply the length of each wall by its height to find the gross wall area.
- Add up the areas of doors, windows and other openings and subtract them from the gross area; the result is the net wall area.
- Multiply the net area by the number of units per square meter for the unit you chose.
- Add the waste allowance and round the result up.
As a formula: order quantity = net area × units/m² × (1 + waste rate). The tool's default values are 60 m² of wall, 6 m² of openings and 5% waste, which give about 1,418 units for 13.5 cm brick.
Unit dimensions and units per square meter
The most common wall units in Turkey and the area they cover on the wall face are as follows:
| Unit | Size (cm) | Joint | Units/m² |
|---|---|---|---|
| 13.5 cm horizontally perforated brick | 19 × 13.5 × 19 | 1 cm mortar | 25 |
| 19 cm horizontally perforated brick | 19 × 19 × 19 | 1 cm mortar | 25 |
| 10 cm aerated concrete block | 60 × 25 × 10 | 3 mm adhesive | 6.67 |
| 20 cm aerated concrete block | 60 × 25 × 20 | 3 mm adhesive | 6.67 |
For brick, once a 1 cm mortar joint is added to the 19 cm face dimension, each brick covers 20 × 20 = 400 cm² of wall face; 10,000 cm² (1 m²) ÷ 400 = 25 units. For aerated concrete, since the block face is 60 × 25 = 1,500 cm², 10,000 ÷ 1,500 = 6.67 units are needed. The thin joint thickness (3 mm) is ignored. The thickness (10 or 20 cm) does not change the number of faces; it affects only the volume, the weight and the amount of adhesive. Actual product dimensions can vary by a few millimeters by brand, so check the manufacturer's technical data sheet.
Opening deduction: doors and windows
Forgetting to subtract openings from the gross area leads you to a higher quantity than necessary. A typical floor example:
- Perimeter 36 m, floor height 2.6 m: gross area 93.6 m²
- 4 interior/exterior doors (1.0 × 2.1 m): 8.4 m²
- 6 windows (1.2 × 1.3 m): 9.36 m²
- Total openings 17.76 m², net area 75.84 m²
With 13.5 cm brick, 75.84 × 25 = 1,896 units, and with 5% waste 1,990.8, so 1,991 units are ordered. If you had not deducted the openings, you would have found 93.6 × 25 × 1.05 = 2,457 units; the difference is 466 units. Not deducting very small openings (such as ventilation holes) and leaving them to the waste allowance is a common practice.
What should the waste allowance be?
Waste covers units broken during transport and units cut at corners and around openings. 3-5% is generally used, and the tool's default is 5%. If the plan has many corners, there are many cuts, or you use a material that is cut to fit, like aerated concrete, you can raise the rate somewhat. Example: for 70 m² of net wall, aerated concrete needs 466.7 units without waste, 490 units with 5% waste, and 504 units with 8% waste.
Mortar and cement estimate for brick walls
In a brick wall there is a horizontal mortar joint under each brick and a vertical one beside it. The geometric calculation gives the joint volume based on brick thickness, and a 25% allowance is added for losses such as mortar filling voids and spilling:
- 13.5 cm brick: about 16.5 liters of mortar/m²
- 19 cm brick: about 23.2 liters of mortar/m²
In our floor example (75.84 m², 13.5 cm): 75.84 × 0.01645 = 1.25 m³ of mortar. If the mortar dosage is 300 kg cement/m³, 1.25 × 300 ≈ 374 kg of cement is needed, that is, 8 bags of 50 kg. With 19 cm brick, the same area needs 75.84 × 0.02316 = 1.76 m³ of mortar and about 527 kg of cement. The mortar dosage varies with the mix used (for example 1:4 or 1:5); confirm the sand quantity with your mason or the ready-mix mortar manufacturer. These values are estimates; over- or under-consumption is common.
Adhesive estimate for aerated concrete
Aerated concrete blocks are laid with 2-3 mm thin-joint adhesive. With a 25 cm block height, there are 4 horizontal joints per meter of height. Assuming a 3 mm joint and a density of about 1,500 kg/m³:
- 10 cm wall: 4 × 0.10 × 0.003 × 1,500 = 1.8 kg/m²
- 20 cm wall: 4 × 0.20 × 0.003 × 1,500 = 3.6 kg/m²
For 70 m² of net 20 cm aerated concrete wall, 252 kg is needed, that is, 11 bags of 25 kg. For 10 cm aerated concrete over the same area, 126 kg (6 bags) is enough. Actual consumption varies with the product and application; rely on the coverage information printed on the bag.
Brick or aerated concrete: a comparison of quantity and volume
Requirements for the same 70 m² of net wall:
| Option | Units without waste | Units with 5% waste | Additional material |
|---|---|---|---|
| 13.5 cm brick | 1,750 | 1,838 | ≈ 1.15 m³ mortar |
| 19 cm brick | 1,750 | 1,838 | ≈ 1.62 m³ mortar |
| 20 cm aerated concrete | 467 | 490 | ≈ 252 kg adhesive |
| 10 cm aerated concrete | 467 | 490 | ≈ 126 kg adhesive |
Aerated concrete is laid with fewer units and faster; brick is more widespread and easier to source in many regions. Thermal insulation, the earthquake regulation and project requirements determine the wall thickness; make the choice with your architect and structural engineer.
Checklist before ordering
- Re-check the wall area against the plan using the scale; add up interior and exterior walls separately.
- Subtract door and window openings by their dimensions; do not forget the lintel and tie-beam zones.
- Ask the supplier for the unit dimensions and the pack quantity (units per pallet).
- Confirm the dosage and coverage values for mortar, cement and adhesive with the manufacturer.
- Set the waste allowance taking delivery and breakage risk into account.
Steps for using the tool
- Enter the total wall area and the total of the openings in square meters.
- Select the wall unit (13.5 cm or 19 cm brick, or 10-20 cm aerated concrete).
- Set the waste rate and, for brick, the cement dosage.
- See the net area, the quantity without and with waste, and the mortar or adhesive estimate in the result.
A similar calculation is needed for roof covering; for that you can look at the Roof Area and Tile Quantity Calculator. All results are theoretical estimates and do not replace the official project or the application details.
Frequently asked questions
How many 13.5 cm bricks go into a square meter?
A brick measuring 19×13.5×19 cm covers 20×20 cm of wall face with a 1 cm mortar joint, so about 25 units go into a square meter. A 19 cm brick has the same face dimensions, so its quantity is the same; the difference is in the mortar and weight that come from the thickness.
How many aerated concrete blocks per m² are needed?
With a standard 60×25 cm block, one block covers 0.15 m² of face, so about 6.67 units go into a square meter. For 70 m² of net wall, 467 units are needed, or 490 with 5% waste. Thickness (10 or 20 cm) changes not the quantity but the volume and the amount of adhesive.
What should the waste rate be?
Usually 3-5% is used; the tool's default is 5%. If there will be a lot of cutting and breakage, for example in plans with many corners or with aerated concrete where there is a lot of cutting, you can raise the rate. It is best to decide the exact value together with your mason.
Tools mentioned in this guide
More guides
- How to Calculate Roof Area and Tile Quantity: A Roof Slope Guide – How are roof slope in degrees and percent, the slope factor, overhang and tile quantity (10-15 per m²) calculated? Numerical examples and tables.
- How to Calculate Concrete Quantity? m³, Waste Allowance, and Mixer Count – Concrete m³ for foundations, slabs, columns, and shear walls, a 5% waste allowance, mixer count, and approximate C25 cement, sand, and gravel.
- How to Calculate Stair Step Count and Riser Height? (2r+g=63) – Stair calculation: step count from floor height, riser (16-18 cm), tread width (2r+g=63), stair run length, and slope. With example tables.
- How to Calculate Percentages: Six Question Types, Formulas and Examples – Percentage math: percent of a number, what percent one is of another, increase and decrease, percentage points and reverse percentages, with examples.
- How to Calculate VAT: VAT-Inclusive and VAT-Exclusive Formulas and Examples – How do you separate VAT from a VAT-inclusive amount or add it to a VAT-exclusive one? Formulas, a mixed-rate invoice, rounding gaps and shortcuts.
Important note: This tool and its results are informational estimates only. They do not replace investment, tax, legal or accounting advice and are not a recommendation to buy or sell anything. Rates and amounts change; rely on the Official Gazette and the relevant authority's announcements for binding values, and consult an accountant, lawyer or your bank before making decisions.
This article is for general information only and is not legal, financial or medical advice. We are not an official institution.